A launch, a policy change and a deprecation.
Every event the record holds dated 8 to 14 June 2026, newest first, each with its own page and the document behind it. The log only ever gains entries, so a week can still gain one entered late.
- Week
- Events
- 3
- Providers
- 2
- Origin
- 0 detected · 3 from a primary source
Every entry from 8 to 14 June 2026.
- Anthropicpolicysource ↗
US export-control directive suspends Fable 5 and Mythos 5
All customer access disabled three days after launch; restored at the end of June.
- OpenAIdeprecationsource ↗
The GPT-5 and o3 snapshots are deprecated
Six models scheduled for 11 December 2026, sixteen months after the GPT-5 family launched.
- Anthropiclaunchsource ↗
Claude Fable 5 opens the Mythos tier
The first publicly available model above the Opus class, at $10 / $50.
Newer: the week of 20 Jul 2026, with 2 launches and a deprecation.
Older: the week of 20 Apr 2026, with a launch, a deprecation and an availability change.
A week is a page when it holds 3 events or more that stand in the record. Under that, a digest would restate the events' own pages, so those weeks are rows in the ledger and nothing more. A row superseded by a correction is not counted, and the correction is. Every week that is a page is listed by week.
The log is published as RSS at /log/rss.xml and as a JSON Feed at /api/v1/feed.json, both public and with no key. Nothing in either feed is a recommendation to act.
